MO |
111101A |
CAPATAZ CIVIL CIV |
hh |
9.668258 |
MO |
111201A |
OPERADOR PESADO CIV |
hh |
9.407082 |
MO |
111202A |
OPERADOR MEDIANO CIV |
hh |
9.374337 |
MO |
111203A |
OPERADOR LIVIANO CIV |
hh |
9.374337 |
MO |
111301A |
TOPOGRAFO CIV + HERRAM |
hh |
8.457505 |
MO |
111401A |
OPERARIO CIV + HERRAM |
hh |
8.253504 |
MO |
111501A |
OFICIAL CIV + HERRAM |
hh |
6.666544 |
MO |
111601A |
PEON CIV + HERRAM |
hh |
6.112830 |
MO |
111602A |
VIGIA |
hh |
6.112830 |
MO |
111602B |
SEÑALERO |
hh |
6.112830 |
MO |
111409A |
TECNICO VENDOR |
hh |
11.790000 |
MO |
111102A |
CAPATAZ ELECTROMECANICO ELM |
hh |
10.330000 |
MO |
111403A |
SOLDADOR CALIFICADO 6G |
hh |
22.000000 |
MO |
111403B |
SOLDADOR ESTRUCTURAL 3G |
hh |
8.800000 |
MO |
111403C |
SOLDADOR HDPE |
hh |
8.800000 |
MO |
111404A |
MECANICO DE ALINEAMIENTO |
hh |
8.800000 |
MO |
111404B |
MECANICO DE ESTRUCTURA |
hh |
8.800000 |
MO |
111404C |
MECANICO DE MONTAJE |
hh |
8.800000 |
MO |
111403D |
MANIOBRISTA DE MONTAJE |
hh |
9.710000 |
MO |
111403E |
ANDAMIERO |
hh |
8.800000 |
MO |
111502B |
ELECTRICISTA |
hh |
9.710000 |
MO |
111502C |
INSTRUMENTISTA |
hh |
9.710000 |
MO |
111502A |
OFICIAL ELECTROMECANICO |
hh |
6.670000 |
MO |
111503A |
OFICIAL ELECTROMECANICO |
hh |
7.090000 |
MO |
111603A |
AYUDANTE ELECTROMECANICO |
hh |
6.490000 |
MO |
190080 |
INGRESO DE PERSONAL |
u |
91.000000 |
MO |
190081 |
CERTIFICACION DE OPERADORES |
u |
500.000000 |
MO |
180001A |
TECNICO OPERADOR |
hh |
11.790000 |
MO |
111402A |
OPERARIO MECANICO |
hh |
8.250000 |
MO |
111402B |
OPERARIO CALDERERO |
hh |
8.250000 |
MO |
111402C |
OPERARIO ELECTRICISTA |
hh |
8.250000 |
MT |
2035001 |
CONCRETO PREMEZCLADO FC=40 KG/CM2 T-I |
m3 |
0.900000 |
MT |
2171007 |
CURADOR DE CONCRETO |
gln |
1.840800 |
MT |
3014003 |
CEMENTO ASFALTICO 120/150 |
gln |
3.607800 |
MT |
402110A |
TRANSPORTE DE CEMENTO ASFALTICO |
gln |
0.400000 |
MT |
2011005 |
FILLER MINERAL-CEMENTO PORTLAND |
bls |
7.140000 |
MT |
2011006 |
MEJORADOR DE ADHERENCIA |
kg |
5.270000 |
MT |
2011007 |
AGREGADO PARA ASFALTO |
m3 |
0.000000 |
MT |
3311012 |
TUBINOL - ACEITE CALENTADOR |
gln |
8.000000 |
MT |
3311011 |
DIESEL B5 - PLANTA DE ASFALTO |
gln |
0.000000 |
MT |
3315001 |
BALON DE GAS 45 KG |
bal |
83.000000 |
MT |
2011113 |
ALAMBRE NEGRO #8 |
kg |
1.000000 |
MT |
2011115 |
MADERA PARA ENCOFRADO |
p2 |
2.000000 |
MT |
2011116 |
DESMOLDANTE |
gln |
5.630000 |
MT |
2011114 |
CLAVOS |
kg |
0.800000 |
MT |
380F003 |
MATERIALES VARIOS |
glb |
1.000000 |
MT |
310A005 |
ACERO CORRUGADO FY=4200KG/CM2 G60-DIMEN |
kg |
0.900000 |
MT |
2011112 |
ALAMBRE NEGRO #16 |
kg |
1.000000 |
MT |
313F010 |
SUM PERNO ANCLAJE d=32mm L=5m, fy=520Mpa |
u |
14.420000 |
MT |
40D1010 |
PERNOS DE ANCLAJE d=32mm(fy=520Mpa |
u |
450.090000 |
MT |
40D1012 |
PLACA DE ACERO 120x120x19mm |
u |
9.020000 |
MT |
40F1004 |
TUERCA PARA ANCLAJE (300x300x30mm) |
u |
6.830000 |
MT |
40D1021 |
PERNOS DE ANCLAJE d=6mm |
u |
450.090000 |
MT |
313F011 |
SUM PERNO ANCLAJE d=6mm |
u |
8.800000 |
MT |
40D1011 |
PLANCHA DE ACERO 150mmx3mm |
u |
48.290000 |
MT |
3014006 |
BITUMEN |
u |
100.000000 |
MT |
2011102 |
GLENIUM 3030 NS |
t |
4,502.600000 |
MT |
2011101A |
CEMENTO TIPO 1P (Inyecciones) |
t |
371.450000 |
MT |
2011103 |
RHEOMAC |
t |
35,242.980000 |
MT |
2011104 |
ACCELERATOR |
t |
4,503.040000 |
MT |
3016003 |
ARENA (pasante malla N°8) |
m3 |
115.460000 |
MT |
2011101 |
CEMENTO TIPO 1P (Puesto en obra) |
bls |
9.485712 |
MT |
40B1035 |
TAPA DE TUBERIA CORRUGADA DE 4" y 6" |
u |
16.000000 |
MT |
40B1037 |
CODO 45 600mm |
u |
240.000000 |
MT |
40B1038 |
TEE 45 600mm |
u |
240.000000 |
MT |
40B1039 |
TEE 90 600mm |
u |
240.000000 |
MT |
313F022 |
PERNO ANCLAJE HELICOIDAL D=32mm, 12m |
u |
118.530000 |
MT |
313F023 |
PERNO ANCLAJE HELICOIDAL D=32mm, 2m |
u |
30.530000 |
MT |
313F033 |
ANCLAJE DE CABLE FLEXIBLE, 14.5mm |
u |
91.390000 |
MT |
313F025 |
SUM MALLA DE ALTO LIMITE ELASTICO |
m2 |
25.100000 |
MT |
40B1036 |
CANASTILLA PARA TUBERIA |
u |
192.000000 |
MT |
325I003 |
GEOCOMPUESTO DE DRENAJE |
m2 |
10.640000 |
MT |
4041012 |
DEFLECTORES |
m |
165.000000 |
MT |
310E035 |
SUMINISTRO DE BARANDA PREFABRICADA |
m |
100.000000 |
MT |
3016023 |
PIEDRA PARA MAMPOSTERIA |
m3 |
24.000000 |
MT |
380F001 |
TRANQUERAS Y CONOS |
mes |
850.000000 |
MT |
380F002 |
MATERIALES PARA TOPOGRAFIA |
mes |
500.000000 |
MT |
3016004 |
ARENA SILICA |
m3 |
266.000000 |
MT |
3015008 |
BENTONITA Y CEMENTO |
m3 |
399.000000 |
MT |
40D1022 |
PERNOS DE ANCLAJE d=3/4in |
u |
468.000000 |
MT |
40D1025 |
PERNOS DE ANCLAJE HILTI |
u |
390.000000 |
MT |
3016024 |
PIEDRA MEDIANA |
m3 |
30.000000 |
MT |
325G010 |
GEOTEXTIL NT 540GR/M2 |
m2 |
2.940000 |
MT |
326D027 |
JUNTA ELASTOMERICA |
m |
8.800000 |
MT |
326D029 |
JUNTA CON ACRILICO |
m2 |
27.500000 |
MT |
361F011 |
TUBO PVC SCH40 D=50MM |
m |
3.080000 |
MT |
313F035 |
CABLE DE BORDE 12MM |
m |
6.240000 |
MT |
40F1010 |
INST CABLE BORDE 12MM |
m |
4.100000 |
EQ |
21104A |
CAMION CISTERNA P/AGUA 5000 GLN_TOTAL |
hm |
29.096930 |
EQ |
24205A |
TRACTOR S/ORUGA 200-240HP_D6 TOTAL |
hm |
58.810000 |
EQ |
23915A |
RODILLO LISO VIBR 103HP CS533E 10T_TOTAL |
hm |
27.236970 |
EQ |
23210C |
MINICARGADOR S/LLANTA DE 90-94HP |
hm |
22.460000 |
EQ |
25511A |
TORRE DE ILUMINACION |
hm |
1.880000 |
EQ |
20915A |
CARGADOR CA966 260HP 4M3_TOTAL |
hm |
77.150100 |
EQ |
20614A |
CAMION VOLQUETE 8X4 DE 24M3 |
hm |
29.648080 |
EQ |
23305A |
MOTONIVELADORA 140K, 165-190HP -TO_TOTAL |
hm |
56.722730 |
EQ |
24206A |
TRACTOR S/ORUGA 240-350HP_D8 TOTAL |
hm |
76.643280 |
EQ |
23922A |
RODILLO LISO VIBRATORIO 19TON_TOTAL |
hm |
29.140000 |
EQ |
21807A |
EXCAVADORA S/ORUGA 247HP C336_TOTAL |
hm |
43.530610 |
EQ |
22402A |
CAMION GRUA DE 12 TON_TOTAL |
hm |
63.516882 |
EQ |
23804A |
RETROEXCAVADORA S/LLAN 94HP C420_TOTAL |
hm |
28.041310 |
EQ |
20330 |
MAQUINA EXTRUSORA |
hm |
68.450000 |
EQ |
23531A |
COMPRESORAS 250PCM |
hm |
8.310000 |
EQ |
20404A |
MOTOBOMBA DE AGUA 12HP 4in_TOTAL |
hm |
11.230000 |
EQ |
23114 |
MARTILLO HIDRAULICO 1.7TON P/EXCAVAD 330 |
hm |
25.864800 |
EQ |
21814A |
EXCAVADORA 5.1 M3 [C390]_TOTAL |
hm |
103.410000 |
EQ |
21520A |
OPERACION PLANTA ASFALTO DISCONTINUA |
hm |
99.270000 |
EQ |
22525A |
GRUPO ELECTROGENO 351KW_TOTAL |
hm |
35.570000 |
EQ |
21605A |
CALENTADOR DE ASFALTO 5HP_TOTAL |
hm |
31.750000 |
EQ |
22516A |
GRUPO ELECTROGENO 100KW_TOTAL |
hm |
8.984000 |
EQ |
20914A |
CARGADOR CA950 190-211HP 3.1 M3_TOTAL |
hm |
53.570000 |
EQ |
20602A |
CAMION VOLQUETE 6X4 DE 15M3_TOTAL |
hm |
34.300000 |
EQ |
24607A |
CARMIX 3.5M3_TOTAL |
hm |
43.516250 |
EQ |
21505A |
PAVIMENTADORA ASFALTO SUPER 1300 _TOTAL |
hm |
110.180000 |
EQ |
21540A |
EQUIPO DE TRANSFERENCIA MTB |
hm |
145.180000 |
EQ |
23210A |
MINICARGADOR S/LLANTA+HEATER |
hm |
51.860000 |
EQ |
21530A |
RODILLO TANDEM 10-14TON |
hm |
65.980000 |
EQ |
20320 |
TUBERIA PARA BOMBA CONCRETERA |
hm |
7.000000 |
EQ |
20305A |
BOMBA CONCRETO D2 60 M3/H_TOTAL |
hm |
0.000000 |
EQ |
20625A |
CAMION SERVICIO |
hm |
41.600000 |
EQ |
25512A |
PLANCHA COMPACTADORA |
hm |
3.790000 |
EQ |
25516 |
CIZALLA |
hm |
5.460000 |
EQ |
25517 |
DOBLADORA |
hm |
5.460000 |
EQ |
23501A |
PERFO NEUMAT S/ORUGA ØMED 1 3/4in-4_TOTAL |
hm |
127.110000 |
EQ |
2520201 |
ESTACION TOTAL |
hm |
5.000000 |
EQ |
2520209 |
EQUIPO - TOPOGRAFIA |
hm |
3.000000 |
SC |
402035D |
MOVILIZACION DE EQUIPOS |
glb |
247,099.940000 |
SC |
402035E |
DESMOVILIZACION DE EQUIPOS |
glb |
247,099.940000 |
SC |
402036A |
MOVILIZ Y DESMOVILIZ PERF & INYECC |
glb |
113,923.840000 |
SC |
402036B |
MOVILIZ Y DESMOVILIZ SOSTENIMIENTO |
glb |
275,183.200000 |
SC |
402002A |
OFICINAS Y COMEDOR |
glb |
451,923.000000 |
SC |
402108A |
TALLER |
glb |
279,963.000000 |
SC |
4072018 |
ENCOFRADO METALICO |
m2-d |
1.090000 |
SC |
J1010668 |
Perforación para Grouting - NQ (75.7mm diámetro) |
m |
427.525000 |
SC |
J1010672 |
Colocación de las Inyecciones |
m3 |
1,056.569000 |
SC |
40B1004 |
INSTALACION DE GEOMEMBRANA BITUMINOSA |
m2 |
2.870000 |
SC |
40B1003 |
INSTALACION DE GEOMEMBRANA HDPE |
m2 |
1.960000 |
SC |
39500 |
MATERIALES Y CONSUMIBLES ELECTROMECANICO |
glb |
1.000000 |
SC |
114801 |
MANO DE OBRA MECANICOS |
USD |
1.000000 |
SC |
27001 |
EQUIPOS PARA TRABAJOS ELECTROMECANICOS |
Glb |
1.000000 |
SC |
114802 |
MANO DE OBRA - CONTADOR HH |
USD |
0.000000 |
SC |
4041007 |
GUARDAVIAS |
m |
41.600000 |
SC |
402035F |
MOVILIZACION DE PLANTA DE GROUT |
glb |
23,085.000000 |
SC |
402035G |
DESMOVILIZACION DE PLANTA DE GROUT |
glb |
23,085.000000 |
SC |
402132 |
SC SUMINISTRO DE AGUA - GROUTING |
u |
12,422.000000 |
SC |
40D1013 |
PERFORACION PARA GROUTING-NQ (75.7mm) |
m |
427.530000 |
SC |
40D1000 |
PERFORACION PARA INYECCIONES DE CONSOLID |
m |
446.520000 |
SC |
40D1004 |
COLOCACION DE LAS INYECCIONES |
m3 |
1,056.570000 |
SC |
40B1027 |
DESCARGA DE REBOSE |
m |
64.000000 |
SC |
40F1007 |
INST PROTECCION CAIDA ROCAS (100kJ) |
m |
755.650000 |
SC |
325K006 |
SUM MALLA PROTECCION CAIDA ROCAS (100kJ) |
m2 |
598.350000 |
SC |
4076021 |
SERVICIO DE VOLADURA |
m3 |
6.800000 |
SC |
40A6005 |
INSTALACION DE GEOSINTETICOS |
m2 |
1.890000 |
SC |
40F1008 |
INST PERNO ANCLAJE HEICOIDAL |
m |
154.780000 |
SC |
40F1003 |
INST ANCLAJE DE CABLE FLEXIBLE, 14.5mm |
m |
161.080000 |
SC |
40F1002 |
MALLA ROMBOIDE DE ALTA RESIST.1770 N/mm2 |
m2 |
12.190000 |
SC |
40B1023 |
INSTALACION TUBERIA PD HDPE |
m |
67.700000 |
SC |
40B1022 |
INSTALACION TUBERIA HDPE |
m |
90.080000 |
SC |
4072019 |
ENCOFRADO ESPECIAL |
m2-d |
4.430000 |
SC |
4074003 |
SC TARRAJEO IMPERMEABLE PARA MURO |
m2 |
40.000000 |
SC |
4074004 |
TARRAJEO IMPERMEABLE PARA LOSA |
m2 |
35.000000 |
SC |
4072018NA |
ENCOFRADO METALICO |
m2 |
1.090000 |
SC |
40I1012 |
PERFORACION E INSTALACION DE INCLINOMETR |
m |
508.730000 |
SC |
4076015 |
MURO DE LADRILLOS DE CONCRETO KING KONG |
m2 |
108.000000 |
SC |
4076012 |
PUERTA METALICA 2 HOJAS |
u |
3,600.000000 |
SC |
4076008 |
ALAMBRE DE PUAS |
m |
25.000000 |
SC |
40I10 |
COLOC DE BENTONITA Y CEMENTO |
m3 |
120.000000 |
SC |
40I1008 |
INST DE CELDA DE ASENTAMIENTO |
u |
3,990.000000 |
SC |
40I1005 |
INST DE INCLINOMETRO SAA |
u |
4,987.500000 |
SC |
40B1029 |
ACCESORIO TIPO Y |
u |
320.000000 |
SC |
40B1031 |
ACCESORIO TIPO TEE |
u |
320.000000 |
SC |
40I1016 |
INST DE CELDA DE PRESION |
u |
2,526.000000 |
SC |
40I1017 |
INST DE EXTENSOMETROS |
u |
1,396.500000 |
SC |
40I1002 |
HITO TOPOGRAFICO |
u |
239.400000 |
SC |
40I1021 |
INST BARRA DE BRONCE 12.5mm |
u |
45.000000 |
SC |
40I1020 |
INST TRANSMISOR GPS |
u |
750.000000 |
SC |
40I1005A |
INST DE INCLINOMETRO HSAA |
u |
2,887.430000 |
SC |
40I1015 |
REUBICACION DE SISMOGRAFO |
u |
22,770.000000 |
SC |
40I1014 |
REUBICACION DE CASETA |
u |
22,500.000000 |
SC |
40F1009 |
INST TUBO COLECTOR PVC SCH 40 D=50MM |
m |
137.770000 |
SC |
40B1041 |
INSERTO PARA TUBERIA 36in |
u |
390.000000 |
SC |
40B1042 |
INSERTO PARA TUBERIA 18in |
u |
234.000000 |
SC |
40I1006 |
INST DE ACELEROGRAFO |
u |
4,500.000000 |
SC |
40B1026 |
INSTALACION TUBERIA HDPE 200mm |
m |
46.160000 |
SC |
40I1010 |
CABLE DE PIEZOMETRO DE CUERDA VIBRANTE |
m |
10.070000 |
SC |
40I1003 |
INST DE PIEZOMETRO CUERDA VIBRANTE |
u |
2,394.000000 |
SC |
40I1010A |
CABLE DE PIEZOMETRO ELECTRICO |
m |
3.190000 |
SC |
40I1005B |
INST DE INCLINOMETRO SAA |
m |
508.730000 |
SC |
40I1025 |
INST POZO DE MONITOREO |
u |
5,160.000000 |
SC |
40I1018 |
INST EQUIPOS P/ALIMENTACION DE ENERGIA |
u |
3,477.000000 |
SC |
40I1019 |
INST EQUIPOS DE RADIOFRECUENCIA |
u |
1,521.000000 |
SC |
40I1001 |
CASETA DE INSTRUMENTACION |
u |
19,950.000000 |
SC |
40I1007 |
INST DE DATALOGGER |
u |
1,995.000000 |
SC |
40I1011A |
PERFORACION POZA MONITOREO |
m |
332.500000 |
SC |
40I1029 |
TUBERIA SOLIDA DE PVC 2in |
m |
63.000000 |
SC |
40I1031 |
TUBERIA PVC RANURADA |
m |
67.500000 |